Close-up of server racks with blinking lights in a blue-lit data center hallway.

BUILt FOR NATERA

AI Infrastructure Built for Tempus's Multimodal Data

Compliant for clinical AI. Scalable for the PRECISION Challenge.

Book a Call

30-Min Technical Consultation

With WhiteFiber's engineering team. 

No sales deck - straight to infrastructure.

Button

Natera’s Moment

As Natera scales foundation models, regulated genomic pipelines, and NVIDIA-powered workflows, infrastructure becomes the difference between acceleration and operational drag.

What WhiteFiber Delivers

WhiteFiber designs and operates compliant AI infrastructure built for clinical-scale performance.

Black laptop keyboard with blue backlit keys and a fingerprint scanner on the right side.

THE INFRASTRUCTURE CHALLENGE

Multimodal data training and FDA-cleared inference don't run on the same template.

As Tempus trains foundation models across genomics, imaging, ECG, and clinical records, compute stops being a backend decision and becomes part of the validation boundary.

The PRECISION Challenge's promise of scalable compute to researchers is a commitment that needs real infrastructure capacity behind it.

01

Multimodal training is among the most GPU-intensive workloads in life sciences

Genomics, imaging, ECG, and clinical records each carry a different infrastructure profile. Training them together exposes environment variance that undermines reproducibility.

02

FDA-cleared devices put the compute environment inside the validation boundary

ECG-AF, ECG-Low EF, xT CDx, and Tempus Pixel require reproducible, validated infrastructure, not general-purpose cloud sitting outside the validation surface.

03

Product velocity compounds GPU demand faster than procurement cycles can match

A public commitment to scalable compute through the PRECISION Challenge, means infrastructure capacity has to keep pace with a roadmap that isn't slowing down.

HOW WE WORK

Production Infrastructure for Tempus's Next Phase

WhiteFiber designs, deploys, and operates custom AI infrastructure for regulated enterprises. We partner with our customers to ensure their workloads never outgrow their infrastructure.

Industrial room with electrical panels, pipes, and metal framework on a shiny white floor.
01

Requirements

Map Tempus's multimodal training workloads, FDA validation requirements, HIPAA constraints, and NVIDIA stack needs into a single infrastructure brief.

02

Design

Architect dedicated environments for foundation model training and clinical inference, isolated, validated, and matched to genomics, imaging, ECG, and clinical record workloads running together.

03

Deploy

Deploy across WhiteFiber data centers or co-located infrastructure, direct-to-chip liquid cooling, B300 / GB300 clusters, and dark fiber cross-connectivity.

04

Operate

Ongoing management with contracted SLAs, continuous optimization as product velocity compounds, and a team that understands FDA validation and life sciences compliance, not just ops.

The Infrastructure challenge

Three Competencies. One Unified Stack.

Natera's platform spans regulated clinical diagnostics, large-scale model training, and sensitive genomic data. Each demands a distinct infrastructure competency. Delivering all three from a single, coherent architecture - that's where operational control and compliance confidence are either built in or bolted on.

01

Foundation Model Training at Scale

Billion-parameter models require direct-to-chip interconnects, B300/GB300-class GPU clusters, and infrastructure built for sustained distributed training - with the predictability that research timelines depend on.

02

CLIA / GXP Clinical Pipeline Integrity

Clinical genomic workflows perform best in validated, isolated compute environments with full audit trails, change controls, and compliance postures designed from the architecture up - not configured after the fact.

03

HIPAA Patient Data Sovereignty

PHI boundaries require air-gapped options, role-based access, and validated data perimeters. For Natera, data sovereignty isn't a checkbox - it's a structural commitment to the patients whose outcomes depend on it.

WHY WHITEFIBER

The infrastructure decisions you make now determine what scales later.

WhiteFiber designs, builds, and operates compliant, performant, and scalable AI infrastructure.

NVIDIA Partner

Preferred Partner Status

Tempus's multimodal foundation model work demands an infrastructure partner with direct-to-chip access to B300 and GB300, not generic GPU provisioning.

Contracted Delivery

Timelines are contracted, not estimated

For a company shipping six AI products in two weeks, that distinction delivers the operational control the roadmap requires.

Compliance Depth

HIPAA + GxP From the Ground Up

Validated compute environments so teams can ship FDA-cleared devices without the infrastructure layer sitting outside the validation boundary.

Data Sovereignty

Fully Air-Gapped Private AI Option

For genomic and clinical workloads where patient data must never leave a controlled perimeter. Designed for organizations where regulatory confidence is a requirement,
not a feature.

Nvidia Preferred Partner logo
99.95% uptime SLA
HIPAA + GxP
Air-gapped compute

The roadmap doesn't slow down.

Don't let your infrastructure get in the way.

Talk through your workload requirements with WhiteFiber's engineering team. No sales deck, straight to infrastructure.

Talk to an expert